567 Clarke + Como
CaulkingRope & swing-stage accessAt 49 storeys this is the tallest building in Coquitlam, with 364 homes. It was completed in 2021. We caulked the tower's exterior between 2021 and 2025.
References are available on request.

At 49 storeys this is the tallest building in Coquitlam, with 364 homes. It was completed in 2021. We caulked the tower's exterior between 2021 and 2025.

A three-tower community of 50, 45 and 22 storeys, with close to 900 homes. We applied balcony traffic coatings on all three towers and did reveal caulking, billed tower by tower with QC documentation for every floor.

A 35-storey, 650-room landmark hotel opened in 1973. We did swing-stage exterior work and facade washing, scheduled around a fully operating hotel.

A three-tower community of 38, 29 and 28 storeys near Lougheed Town Centre, completed in 2020. We did the exterior caulking and the full exterior paint.

Two 38-storey Metrotown towers. We caulked and painted both, much of it while they were still under construction.

A 37-storey tower with 295 homes beside Bonsor Park, completed in 2015. We did the exterior caulking and painting.

The 43-storey sister tower to Met 1, with 312 homes, completed in 2017. We did the exterior caulking and painting.

A 32-storey tower with 249 homes. We did the exterior caulking and painting.

A 37-storey tower with 245 homes, completed in 2013. We did the exterior caulking and painting.

Three riverfront loft buildings with 237 homes, built in 2006. We ran a full exterior program of painting, sealant replacement and membranes in phases while residents lived on site. The contract was more than $225K.

A 35-storey waterfront tower completed in 2004. We did the exterior caulking and painting work in 2016–17.

A 19-storey tower completed in 2003. We caulked it twice. In 2014 we did the caulking and metal painting. In 2026 we replaced every reveal and penetration joint, about 12,000 linear feet, and that work is covered by the manufacturer's warranty.

A 22-storey tower completed in 2002. We painted its metal-to-metal joints in 2014.

A 25-storey tower completed in 2006. In 2015 we built a high-rise mock-up and did exterior caulking.

A 15-storey waterfront tower completed in 2000. In 2013 we replaced all of its sealant.

A 16-storey waterfront tower completed in 2000. In 2013 we replaced all of its sealant.

A five-tower community of 560 homes between No. 3 Road and Minoru Boulevard, completed in 2013–15. We did the new-construction caulking and painting.

A 10-storey concrete building completed in 1999. We have repainted it twice and replaced its main roof, and we handle its window cleaning, leak investigations and annual maintenance.

A 22-storey tower with 155 homes, built in 2005. We pressure-washed it, re-coated the balcony and eyebrow membranes, sealed cracks and repainted it from rope and swing stage, with a daily photo report to the consultant.

A new three-building, roughly 113,000 sq ft tilt-up industrial park in Port Coquitlam's Dominion Triangle. We caulked the tilt-up panel joints across the site during construction in 2018.

A 22-storey waterfront tower on Marinaside Crescent, built in 1997, with its low-rise townhome podium. We removed and replaced the exterior sealant around the windows and doors, working the tower from bosun chairs, under the building envelope consultant's site reviews.

A six-storey Class A office building from 2000 in downtown Maple Ridge, our home town. We renewed the sealants, painted, and installed glazing and flashing, working from swing stages under the building envelope consultant's site reviews.

A high-rise in the Gilmore Place towers beside Gilmore SkyTrain, Burnaby. We carried out the exterior caulking on the tower.

A 17-storey residential tower completed in 2018 on Burnaby Mountain. We did the exterior caulking and exterior painting.

A 7-storey mixed-use building at UniverCity. We re-caulked the exterior with a manufacturer-backed warranty.

A 21-storey tower built in 1996. Window and building envelope renewal work is underway in 2026, with field reviews and in-suite access.

A 4-storey, 66-home West End building from 1987. We did the caulking maintenance.

A 12-storey downtown hotel built in 1997. We did boom-lift work and installed scuppers.

A 13-storey, 75-home tower from 2001 in Lower Lonsdale. We did caulking and painting.

A 12-storey strata building from 1994 and a long-term client. Our work has included window repairs and cleaning, leak investigations in the parkade and amenity room, hallway and lobby repainting, and a building envelope assessment.

A 4-storey strata building from 1995. We re-caulked the windows in 2026.

An 11-storey tower from 1998. Our work included a colour mock-up for the repaint and caulking and drip-edge testing from rope drops.

Two new 15–16-storey towers beside Minoru Park, built in about 2016. We worked on the balconies during construction and handled the deficiency list.

A 21-storey tower completed in 2016 at UBC. We did exterior work during construction and returned for a work order in 2019.

Towers in the Miramar Village high-rise community. We did rope-access drop inspections for the consultant's report, then caulking and balcony deck work on Towers A and B.

A 17-storey tower from 2013. We did caulking and painting.

A 12-storey, 88-home concrete building completed in 2017. We did sealant adhesion testing and caulking during construction.

Five low-rise office buildings in a Panorama Ridge business park. We did the original exterior painting and caulking from 2014 to 2018, and we are re-caulking and repainting one of the buildings in 2026.
Vancouver: Downtown, Coal Harbour, West End, Yaletown Hyatt Regency Vancouver · Grand Park Hotel & Suites · Callisto · 1616, 1650, 1680, 1717 and 1777 Bayshore Drive · Twelve Thirty Haro · Space · Robson Gardens · First United Church · Hotel Canada · two Burrard Street office towers · Richards & Pender · Crestmark (2021–22)
Vancouver: Fairview Austeville · a West Broadway mid-rise
Vancouver: UBC The Laureates (2016)
North Vancouver The Piermont · Sky · The Q · Springhill Place · Lonsdale strata buildings
West Vancouver Park Royal South · Navvy Jack West · Ambleside · The Boulders
Burnaby Silver · The Park · Moda · Chancellor · Met 1 · Met 2 · The Peak (2018) and The Hub (UniverCity, Burnaby Mountain) · Gilmore (Brentwood)
Coquitlam 567 Clarke + Como · Lougheed Heights · Pine and Glen · Westwood Plateau · The Benton, Port Coquitlam (2026) · Seaborne Park, Port Coquitlam (2018)
New Westminster Murano Lofts · The Clarkson (2016)
Richmond Quintet · Park Residences Towers A and B, Minoru Park (2016) · Camber · Balcony planter waterproofing, Steveston (2026)
White Rock Avra · Miramar Village Towers A and B (2016–17) · Miramar Village Towers 3 and 4 · Beverley (2017)
Maple Ridge Maple Ridge Business Centre (2021)
Surrey and Langley Five low-rise commercial buildings, Panorama Ridge, Surrey: painting and caulking 2014–18; re-caulking and repaint underway 2026 · Latimer Village
More projects Escala · One Central · River Park · LoLo · The Flats
Painting, sealants, membranes and high-rise access, quoted by the person who runs the job.